BIM and VDC
Technical direction CM-BIM certified · AGC of America
We coordinate the project in the model before it reaches the site.
We model every discipline, resolve its clashes and take drawings, quantities, schedule and cost from the same model. CIC and EDCONSA’s construction experience informs our modeling and coordination across disciplines.
↓ Scroll to see the model come together
- 01
Structure
Foundations, columns and beams: the skeleton everything else is coordinated on.
- 02
HVAC
Ducts, units and diffusers, each in place and at its real height.
- 03
Plumbing
Each system with its own color, route and slope.
- Cold water
- Wastewater
- Storm
- Vent
- 04
Electrical and lighting
Conduits by circuit and light fixtures in every space.
- Normal
- Backup (UPS)
- Data
- Lighting
- 05
Architecture and finishes
Walls, glass façade, aluminum composite cladding, floors and doors: the building with its finishes.
- 06
Furniture and equipment
With the roof removed, the interior is visible: workstations, rooms and furniture, each in place.
- 07
Clashes
Clashes are caught before construction: ducts and pipes through beams and columns, marked in red.
- 08
Exploded view
Each discipline on its own layer: that is how it is reviewed, measured and coordinated with each specialist.
- 5disciplines coordinated in a car dealership
- 267clashes resolved in the dealership model, before construction
- 25+years of technical leadership in project management and development
- External reference, not a 3DTEC resultUp to 10%of the contract value was the largest saving observed from detecting clashes in the model.Source: CIFE, Stanford University (2007), study of 32 projects.
From 3D to 7D
One model, from design to operation.

Modeling
Architecture, structure and MEP, and Scan to BIM, at the level of detail each phase needs.

Coordination
Clash detection and coordination meetings with each specialist, using the project's own tool: Navisworks, Solibri, BIMcollab, Revizto or open options based on IFC and BCF. At the dealership: 267 clashes resolved in the model.






Scheduling
The construction schedule linked to the model: every activity in the chart is seen built in its week.






Cost
Quantities come out of the model and go to Presto with their prices: estimate, tender and change control.
☝Tap an item

Sustainability and operation
6D: energy and sustainability. 7D: operation and maintenance. The as-built model, checked against the scan, with the data the building operator needs.
What the model delivers to operate the building (E01):
- 18 HVAC units (indoor units and exhaust fans)
- 14 thermostats · 33 diffusers and grilles
- 220 light fixtures · 13 plumbing fixtures
- ≈ 440 m² of façade glass, key data for the energy study

Information management
BIM execution plan, common data environment, naming, templates and training for your team.
- BIM execution plan (BEP) and information requirements
- Common data environment and approval workflow
- Naming, classification and templates
- Training for the client's team
Rebar detailing
From model to shop: the steel, piece by piece.
From the model or the structural drawings we produce the rebar bending schedule: the shape and dimensions of every piece, its weight per diameter and a cutting plan on stock bars, to buy with the least waste.
Example from a real project, without client data. Tap a sheet to see it full size.Level of detail
Each phase needs its own level of detail (LOD).
Levels per the BIMForum LOD Specification.



- Ø 3/8"
- Ø 1/2"
- Ø 3/4"
- Ø 1"


PhotoAs-built modelPoint cloudTechnical team
- Technical lead
Roger Jover RiveraCivil engineer (UNPHU), 25+ years in project management and development
Certificate of Management – Building Information Modeling (CM-BIM), AGC of America (2019) FARO Focus Laser Scanner Certified (FARO, Florida, 2018) BIM Diploma (UNPHU) - Capture and surveying
Laser scanning, drone flights and field surveys.
- BIM modeling and coordination
Architecture, structure and MEP (electrical, plumbing, HVAC and fire protection): models by discipline, clash coordination and quantities.
- Software development
Add-ins, automation and bridges between programs.
Depending on scope, we bring in specialists with an established track record in each discipline.
Software
We work with your team's software.
- Modeling
Revit, Vectorworks, AutoCAD
- Coordination
Navisworks, Bluebeam Revu
- IFC viewers
BIMvision
- Point cloud
ReCap, FARO Scene
- Cost
Presto, Cost-it
- Visualization
Enscape
- Open source
Blender, QGIS, Python, IfcOpenShell, three.js
Among others, as each project requires. We also work with open-source software and open formats.
Standards
We follow international standards and open formats, including ISO 19650, IFC (ISO 16739) and BCF.
Software names are trademarks of their respective owners. 3DTEC is not affiliated with or sponsored by them.
Have a project to coordinate?
Tell us the phase, the disciplines and what you need from the model.
← Back to home